Tuesday, July 28, 2026
The Daily Bogotá

Local News, Bogotá. Every Day.

Multiple Sources. Transparent Technology.

sport

Bogotá Sports Facility Projects Support Local Clubs in Community Building

Ongoing upgrades and new constructions at key venues give clubs expanded spaces to run programs and connect residents.

By Bogotá Sport Desk · Published July 24, 2026

How we reported this

This article was written by AI from the linked sources and was not reviewed by a journalist before publishing. The Daily Bogotá is part of The Daily Network and follows our reasonable editorial care.

Construction of Bogotá's new El Campín stadium is scheduled to begin in March 2026 on the land currently occupied by El Campincito to the northeast, with the facility expected to open in December 2027 and seat over 50,000 spectators while reaching up to 70,000 for concerts. The 85-year-old original stadium will continue operating until the new one is ready.

Facility upgrades expand options for clubs

Local clubs rely on reliable venues to schedule training sessions, matches and outreach events that bring residents together. The IDRD reports the Gibraltar High-Performance Center (CEFE) is 62.09% complete and the new Velodrome is 48.06% complete, strengthening the city's high-performance sports infrastructure in the southwest. These projects add capacity in areas where clubs already run youth and adult programs.

Renovations address long-standing needs

Bogotá's High-Performance Center is undergoing a major renovation with an investment of approximately 8.7 billion pesos, including the first phase of swimming pool remodeling after six years of inactivity. After a nine-year delay, construction of the new minor coliseums at the El Salitre Sports Unit is expected to start before the end of 2026. Clubs can use these improved sites to host regular community gatherings once work concludes.

The IDRD and Sencia have denied rumors of total demolition of the old El Campín site, preserving continuity for ongoing club activities. These developments allow clubs to maintain schedules while preparing for larger events in the upgraded facilities.

Practical next steps for participation

Residents interested in club programs can check schedules directly with the IDRD for access to the Gibraltar High-Performance Center, the Velodrome and the El Salitre Sports Unit as works progress. Clubs will continue using existing spaces at the original El Campín until the new stadium opens in December 2027.

References Sourced but Not Limited to:

Beta · AI-assisted · human oversight

Your newsroom. Shaped by you.

The Daily Bogotá is in beta. AI may assist with research, summarising and drafting. Automated checks assess sourcing, accuracy and editorial risk before publication, and sensitive material is held for human review. Spotted something off, or want us covering a topic? Tell us. Your feedback is entirely optional and helps shape what we publish next.

The Daily Network · local news across Global